TERMITE CONTROL

termite-control

Termites are not an ordinary ants but are completely different from them. Termites are an insect living in colonies and the termites feed on cellulose. Termites cause heavy losses in property and buildings.
termite control is divided into two phases, first prevention is the treatment of termites in the soil before construction, by making chemical barriers between the soil and the foundations to prevent and repel the termite attack.
The second stage consists in the control of termites after injury through the injection system and termite traps system.
Eagle Trends  pest control are always your best choice for termite control or anti termite treatment in Abu Dhabi before construction and after construction or during injury.

termite control services
termite control services in dubai
termite control services in UAE

Comprehensive Termite Control Solutions in Abu Dhabi – Protection Before, During & After Construction

At Eagle Trends, we understand that termites pose one of the most severe threats to properties in the UAE. Unlike ordinary ants, termites silently devour wood, paper, and even concrete foundations, causing structural damage that often goes unnoticed until it’s too late. Our scientifically-proven termite management systems provide complete protection for your property at every stage.

Why Termites Are More Dangerous Than You Think

✔ Silent Destroyers – Can eat 24/7 for years without detection
✔ Colony Expansion – A mature colony consumes 1kg of wood daily
✔ Structural Damage – Compromise load-bearing beams and foundations
✔ Hidden Activity – 90% of damage occurs inside walls/floors

Our Two-Phase Professional Termite Management

PHASE 1: Pre-Construction Anti-Termite Treatment

(Essential for new buildings)

Chemical Soil Barrier System

  • Trench-and-treat method around foundation

  • Termiticide injection at 5-foot intervals

  • Plastic vapor barriers treated with repellent

Advanced Protection Methods

  • Stainless steel mesh barriers (physical block)

  • Termite-resistant concrete additives

  • Borates wood treatment for framing

PHASE 2: Post-Construction Termite Control

(For existing infestations)

1. Detection & Assessment

  • Moisture meters to find hidden colonies

  • Infrared cameras detecting heat from active nests

  • Acoustic detectors picking up chewing sounds

2. Targeted Elimination

MethodBest ForDuration
Bait Station SystemOngoing prevention6-12 months
Direct Wood InjectionActive infestationsImmediate
Foam TermiticideWall voids24-48 hours
Tent FumigationSevere cases3-5 days

3. Monitoring & Prevention

  • Quarterly inspections with moisture probes

  • Electronic monitoring stations

  • Non-repellent barrier treatments

Why Eagle Trends Stands Above Competitors

✅ 15-Year Warranty on pre-construction treatments
✅ K-9 Termite Detection teams for accurate locating
✅ Boroscope inspections of wall cavities
✅ Eco-sensitive options available

Termite Warning Signs Every Property Owner Should Know

🔍 Mud tubes on foundations
🔍 Hollow-sounding wood when tapped
🔍 Discarded wings near windowsills
🔍 Tight-fitting doors that suddenly stick
🔍 Visible tunnels in wood grain

Commercial Termite Solutions

🏢 High-Rise Building Protection Plans
🏨 Hotel & Resort Preventive Programs
🏗️ Construction Site Pre-Treatment
🏭 Warehouse Wood Preservation

× How can I help you?